To renovate a kitchen, set a realistic budget, plan your layout and finishes, confirm approvals, and hire licensed trades. Then follow the correct order of works: demolition, plumbing and electrical rough in, wall and floor repairs, cabinetry, benchtops, splashback, appliances and final fit off. Most projects take four to twelve weeks on site, once materials have arrived.
Renovating a kitchen is one of the most rewarding upgrades for any home. It is also one of the most complex, because so many trades work in one small space. This guide explains each stage in plain language so you can plan with confidence.
Most kitchen renovation problems come from skipped planning, not poor workmanship. A clear scope, budget and timeline help you avoid delays, variations and rushed decisions. Planning is also where you will save the most money.
Before choosing colours, write a short brief. List what frustrates you about your current kitchen, such as limited bench space, poor storage, and what you want instead. This brief keeps your designer, builder and suppliers working towards the same result.
Your budget should cover design, demolition, trades, cabinetry, benchtops, appliances, lighting and finishes. Add a contingency of 10 to 15 per cent for hidden problems like rotted subfloors, outdated wiring or water damage behind old cupboards.
Good kitchen design is built around how you cook, clean and gather. Many designers use the work triangle, placing the sink, cooktop and fridge within easy reach of each other. Larger, open plan homes often suit zones for prepping, cooking, cleaning and storage instead.
Common kitchen layouts include:
Keeping your sink, dishwasher and cooktop where they are is one of the simplest ways to control costs, as relocating plumbing, gas and drainage adds labour. If the room is simply too small, a house extension may be a better long term answer than squeezing in more cupboards.
Kitchen updates usually don’t need development approval. However, removing a load bearing wall, extending the footprint or altering a heritage listed home may. Check with your local council or, in the ACT, a licensed building certifier before work begins.
All electrical, plumbing and gas work must be done by licensed tradespeople, who should issue compliance certificates when finished. If your home was built before 1990, arrange an asbestos inspection before demolition, as older wall linings, splashbacks and vinyl flooring may contain it.
Finalise selections early, because custom cabinetry and benchtops can take several weeks to manufacture.
Plan your lighting too. Pair ceiling lights with task lighting under overhead cupboards so benchtops are well lit for food preparation.
Empty every cupboard and set up a temporary kitchen elsewhere with a microwave, kettle and small fridge. Protect nearby floors and furniture, and agree on site access, rubbish removal and work hours with your builder.
Working in the correct order prevents rework and damage to new finishes:
Knowing how to renovate a kitchen comes down to clear goals, a realistic budget and the right sequence of work. For inspiration, browse completed projects in our portfolio or explore our home designs. When you’re ready to talk through your plans, contact the team for an obligation free consultation.
Most kitchen renovations take four to twelve weeks on site, depending on size, approvals and cabinetry lead times. Design and planning usually add one to three months.
Strip out first, then rough in plumbing and electrical, finish walls and flooring, install cabinetry and benchtops, add the splashback and complete the fit off.
Yes, for most homes. A well designed kitchen improves daily living and is one of the features buyers notice first.